SEA - Site Engineering Assistance
SEA - Site  Engineering Assistance

LNG Import Terminal El Musel

Execution of the mechanical erection of the new LNG import terminal carried out by UTE Montajes Musel in El Musel (Gijón, Spain) for Enagas. The scope of the works included 40.000 in piping construction and the erection of the mechanical equipments of the plant.

Versión para imprimir Versión para imprimir | Mapa del sitio
© SEA - Site Engineering Assistance